1 — What Is an ATS Flight Plan, and When Must You File One?
An ATS flight plan is the message you send to air traffic services describing the flight you intend to fly — who you are, what you fly, from where to where, when, how high and how long. Its quiet but vital job is alerting and search-and-rescue: if you don’t arrive, the filed plan is what tells someone to come looking.
You must file (under SERA.4001 — covered in Air Law) for, among others:
- any flight that will cross an international border;
- any flight that will receive an air traffic control service (e.g. into controlled airspace, IFR);
- flights to or from designated areas to support alerting and SAR.
A filed flight plan is valid as filed; if your departure slips, you must update the EOBT (below) or it can be discarded.
2 — Completing the Form, Field by Field
The ICAO flight plan form is the same worldwide; the item numbers are standard. Most fields are codes. For a VFR cross-country you mainly complete items 7, 8, 9, 13, 15, 16 and 19:
OEABC Registration or the agreed callsign — no hyphen. V G V = VFR. Type of flight G = general aviation. 1 C172 L One aircraft, type designator, wake category L (light, < 7 t). SD / C Radio/nav/approach aids and transponder (S standard, D DME; C = Mode C). LOWL 0830 Departure aerodrome + estimated off-block time, UTC. N0110 VFR ... Cruising TAS, level (or VFR), then the route/waypoints. LOWK 0105 LOWG Destination, total estimated elapsed time, alternate aerodrome(s). DOF/260618 Date of flight, remarks — e.g. RMK/, STS/. E/0300 P/2 Fuel endurance (hh mm), persons on board, emergency/survival kit — for SAR. Item numbers are the ICAO standard. For a VFR cross-country you mostly touch 7, 8, 9, 13, 15, 16 and 19.
V = VFR), Item 9 wake category (L light for our aircraft), Item 10 equipment (transponder C = Mode C, S = Mode S), Item 13 the EOBT in UTC, and Item 19 endurance and persons on board — the SAR data.3 — Submitting, the EOBT, Delays and Closing
- How and when to submit. File at the briefing office, by phone, or online — normally at least 60 minutes before departure (and, if filing in the air, in good time before reaching the airspace concerned).
- EOBT is the estimated off-block time — when you start to taxi, in UTC. ETA is the estimated time of arrival.
- If you’re delayed, a flight plan whose EOBT is out by more than 30 minutes must be amended or refiled — otherwise it may be deleted.
- Closing the flight plan. On arrival, close it (an arrival report). If you land at an aerodrome other than the one filed, you must tell ATS.
4 — The Pre-Flight Briefing: AIP and NOTAM
Before you fly you self-brief from two sources. The AIP (Aeronautical Information Publication) is the permanent reference, in three parts:
- GEN — general (rules, units, addresses);
- ENR — en-route (airspace, routes, nav aids, hazards);
- AD — aerodromes (charts, runways, services, procedures).
NOTAMs carry the temporary and time-critical changes the AIP can’t — a closed runway, an unserviceable navaid, a temporary restriction, work in progress. Always read the NOTAMs for departure, destination, alternates and the route.
5 — Choosing Departure, Destination and Alternate
A usable aerodrome is one whose runway, services, hours and procedures fit your aircraft and your flight — confirmed from the AIP and current NOTAMs. For VFR you don’t always need an alternate, but you plan one whenever the destination might not be usable (weather, PPR hours, a single runway out of wind) — and you must carry the fuel to reach it (Lesson 8).
6 — Practice: Read a NOTAM, Fill the Form
The exam doesn’t only ask what a NOTAM or a flight-plan field is — it shows you one and asks you to read it. NOTAMs follow a fixed layout: a Q-line summary, then A) aerodrome, B) start and C) end times (UTC), and E) the plain-language message.
A0573/26 NOTAMN series A, number 0573, year 2026 A NEW notam (NOTAMN; R = replaces, C = cancels a previous one). Q) LOVV/QMRLC/... FIR LOVV (Wien); Q-code QMRLC Subject MR = runway, status LC = closed. The Q-line is the machine summary. A) LOWG aerodrome Applies to Graz (ICAO LOWG). B) 2606180600 valid from From 18 Jun 2026, 06:00 UTC. C) 2606201800 EST valid until Until 20 Jun 2026, 18:00 UTC. EST = estimated end. E) RWY 17/35 CLSD DUE WIP plain-language item Runway 17/35 closed due to work in progress — the operational message. Read the Q-code and the E) line first: this one says runway 17/35 is closed for two days. Always check the B)/C) validity against your time of flight.
Now the other direction — turn a flight into form entries. OE-ABC, a Cessna 172, LOWL → LOWK, alternate LOWG, off-block 08:30 UTC, 2 on board, 3 h fuel:
- Item 7
OEABC· Item 8V G(VFR, general aviation) · Item 91 C172 L(one light aircraft) - Item 13
LOWL0830(departure + EOBT in UTC) · Item 16LOWK ... LOWG(destination, EET, alternate) - Item 19
E/0300 P/2(3 h endurance, 2 persons on board — the SAR data)
You read these field values straight off your operational flight plan — the endurance from your fuel plan (Lesson 8), the route and times from the navigation log (Lesson 11). The flight plan form is just the planning numbers, re-packaged for ATS.
7 — The Go/No-Go: Daylight, Ice and Equipment
Three pre-flight checks decide whether the flight may legally and safely be made at all: